
The Blade Barrier was presented on July 2, 2025, as the first noise barrier constructed from discarded wind turbine blades. The 60-meter-long test setup is located along the A58 highway near Oirschot and will be monitored until the end of 2026 within InnovA58; de infraproeftuin van Rijkswaterstaat (the Dutch Ministry of Infrastructure and Water Management). Read more




